The Lower Neponset River is an important resource with significance to public health, recreation, the environment, and the history of its environs. In order to address issues, ideas, and alternatives for the cleanup, restoration, and preservation of the River, a Citizens Advisory Committee (CAC) has been sponsored by the state Department of Conservation and Recreation, the Department of Fish and Game, the City of Boston Office of Environmental and Energy Services, the Town of Milton Conservation Commission, the Lower Mills Merchants Association, and the Neponset River Watershed Association.
In order to ensure a fair and open dialogue, the independent Consensus Building Institute (CBI) of Cambridge, MA has been asked to facilitate the Committee. The Committee’s members will be broadly representative of the many community groups along the Neponset, to ensure that a diversity of viewpoints are represented.
Documents to Download
Links
Meeting - October 30, 2008
Baker Square Condominiums
Function room in the Park Mill
1243 Adams Street Dorchester
6:00 PM Light Dinner Provided
6:30 PM – 9:30 PM Meeting
Meeting - September 25, 2008
Meeting - July 2008
Meeting - June 2008
Meeting - May 2008
Links:
[1] http://cbuilding.org/sites/default/files/cacMEMBER4-30.doc
[2] http://www.mass.gov/dep/cleanup/sites/neponset.htm
[3] http://www.epa.gov/NE/ge/thesite/restofriver.html
[4] http://www.epa.gov/NE/ge/thesite/restofriver-reports.html#ERA
[5] http://cbuilding.org/sites/default/files/CAC_Oct_Agd.doc
[6] http://cbuilding.org/sites/default/files/CAC_Sept_Agd_Rev.pdf
[7] http://cbuilding.org/sites/default/files/Riverways%2520Visualizations%2520for%2520CAC%2520Oct%252008.pdf
[8] http://cbuilding.org/sites/default/files/Kristen%2520Ferry%2520DMF%2520Presentation%2520to%2520CAC%2520Oct%252008%2520small%2520file.pdf
[9] http://cbuilding.org/sites/default/files/executivesummarynov06.pdf
[10] http://cbuilding.org/sites/default/files/Joan%2520Kimball%2520presentation%2520to%2520CAC%2520July%252028%25202008.pdf
[11] http://cbuilding.org/sites/default/files/Jim%2520MacBroom%2520Presentation%2520to%2520CAC%2520July%25202008.pdf
[12] http://cbuilding.org/sites/default/files/CAC_summary_7_28_08.pdf
[13] http://cbuilding.org/sites/default/files/CACJuneAgdrev6-5.pdf
[14] http://cbuilding.org/sites/default/files/foley%2520directions.pdf
[15] http://cbuilding.org/sites/default/files/NeponsetWorkPlandrev6-1.pdf
[16] http://cbuilding.org/sites/default/files/CAC%2520DRAFT%2520Evaluation%2520Criteria_6_4_08.doc
[17] http://cbuilding.org/sites/default/files/CAC_summary_6_5_08.doc
[18] http://cbuilding.org/sites/default/files/DRAFT%2520Evaluation%2520Criteria_6_8_08.doc
[19] http://cbuilding.org/sites/default/files/Draft_Groundrules_Neponset_6-08.doc
[20] http://cbuilding.org/sites/default/files/CACMayAgdrev5-15.doc
[21] http://cbuilding.org/sites/default/files/Draft_Groundrules_Neponset_4-30.pdf
[22] http://cbuilding.org/sites/default/files/Joan%2520presentation%2520to%2520CAC%2520May%252015%2520-2008.pdf
[23] http://cbuilding.org/sites/default/files/Ian%2520Slides.pdf
[24] http://cbuilding.org/sites/default/files/CAC_summary_5_15_08final.doc